Skip to main content

We are there where you deal with complex challenges in separation processes

We offer our services for your project, whether with advice on the selection and operation of suitable technologies or with regard to various influencing factors such as safety, performance and costs. You benefit from the experience of specialists qualified in previous projects and thus increase the efficiency of your workflows and the know-how of your teams.

 

With plants from Herrenknecht Separations, the separation process will not become a bottleneck for your project. With first-class project references worldwide, Herrenknecht Separations has extensive experience.

 

Melbourne Metro Rail – Australia

Precise planning and a high degree of adaptability to local, inner-city conditions formed the basis for worry-free separation and ensured maximum tunnelling speed despite a variety of challenges.

 

Go to project

Rijnlandroute – Netherlands

To ensure maximum advance rates for a Mixshield tunnel boring machine, Herrenknecht Separations supplied a separation plant with a capacity of up to 2,800 m³ per hour and advance rates of up to 100 mm per minute.

 

Go to project

Grand Paris Express – France

With the right plant for every requirement, Herrenknecht Separations also ensured optimum separation results for the extension of the metro network in Paris. The HKS separation plant used there worked in conjunction with a highly efficient fine processing system and centrifuge and covered capacities of up to 500 m³ per hour.

 

Go to project

Chengdu-Pujiang Railway Zirui Tunnel - China

Excellent performance, no fear of complex geology.

 

Go to project

Shanghai Airport Liaison Line Bid 3 - China

Effective for Shanghai clay geology, smooth digging and two sets of separation plants as a backup, high safety redundancy.

 

Go to project